Build guide~6 min read
Production readiness
A production readiness audit checks whether a factory can build your design at your target cost. Do it before you pay for prototypes or tooling.
Updated
Check the design before paying to build it.
The audit
An engineer reviews manufacturability, supplier feasibility, cost drivers and the certification path.
Fixed price, quoted after a 30-minute call.
Manufacturability report
Cost drivers
Design changes
Clear verdict
Engineer readout
Uncomfortable truths
An unbuildable wearable
A sensor concept
A medical device
Details altered to protect client confidentiality.
Eleven engineering stages
Product definition
Industrial design
Engineering design
Production readiness audit
Appearance model
Works-like prototype
Engineering prototype
Design freeze
Tooling
First article and pilot
Mass production and export
Prototype stages are scoped by the audit and approved before starting.
The same team carries design records through tooling, inspection and export.
Questions
FAQ
Related guides
How to read a China quote
What each line on a Chinese factory quote means, what is usually missing, how to build the delivered cost, and the red flags that cost small brands money.
~7 min readCE marking for small electronics sold in the EU
Which EU rules apply to small electronics from China, which documents the factory must supply, who is responsible, and the traps in Chinese certificates.
~7 min readHow to approve a sample from a Chinese factory
What to measure, photograph and write down before you approve a sample from a Chinese factory, and how a golden sample protects your bulk order.
~6 min read
This guide belongs to Build.
Read next: Pricing, How it works, Build.
Get a quote for your product
Tell us the product, quantity, target price and destination.
Submit a request